This project is read-only.

date field issue

May 11, 2009 at 10:12 PM
 

I'm having a problem with date fields format  in synchronization.

I have a date field in SP that shows the date in the portuguese date format (DD-MM-YYYY).

When I do the synchronization, it places the date in the format MM-DD-YYYY.

My SLAM's DB collation is the portuguese collation (SQL_Latin1_General_CP850_CI_AI).

My SP Site database collation is Latin1_General_CI_AS_KS_WS

Do I need to have the same collation in both databases? 

Thanks for the help!

Developer
May 12, 2009 at 6:12 AM

I had created a fix but did not upload it.  Now it is up, though it is not warranting a new release.  Just download the setup again and install it.  After installation your SLAM Control Panel should say Version 1.2.0.3.

Thanks,

-Brian